E-Matic Survey

Huge price reductions
T8 to T5 converter
Quicker return on investment
Low initial outlay cost

Details

Project summary

E-Matic ref.

Project ref.

Date

CEF Branch

CEF Email Address

CEF Telephone

Contractor name

Contact

End user information

Contact

Organisation

Address

Financial

Currency used


Install Cost


Electricity Unit Price (p/kWh)


CCL Rate


CO2 Emission Factor


Running Hours

Total up the current usage to calculate savings
Day
Mon
Tue
Wed
Thu
Fri
Sat
Sun
Night
Mon
Tue
Wed
Thu
Fri
Sat
Sun
Electricity night rate is typically 6hrs from Midnight to 6am
Weeks
Total hours

Fittings

Occupancy Rate


Estimated time area is occupied if sensors to be installed. Leave at 100% if not fitted.
Additional Equipment


Additional item cost such as Occupancy sensors etc.
Select the existing product for replacement, followed by Add
Description
Watts
Replacement
Quantity

Estimate

Equipment list
Part Code Description Quantity of
replacement fitting
Price each Total
Reset Prices ---

Savings

Project summary
Project ref.
Date
Contractor Name
Save Survey
Payback xx Years
Project Life xx Years
Total CO2 Saved yy Tonnes
(zz Tonnes Per Year)
Send Survey
Existing Installation
Year 1
Year 2
Year 3
Year 4
Year 5

Energy consumption

CO2 Emissions

Electricity Cost

Relamping Cost

CCL Cost

Total Cost

         
         
         
         
         
         
Ematic Installation

Energy consumption

CO2 Emissions

Project Cost

Further installs

Relamp Cost

Electricity Cost

CCL Cost

Total Cost

         
         
  --- --- --- ---
         
         
         
         
         
Savings

Energy consumption

Consumption %

CO2 Emissions

Electricity Cost

Product Cost

CCL Cost

Cumulative Cost

Net Cumulative (inc. project cost)

         
         
         
         
         
         
         
         

App Settings

Below are the settings applied to any submitted surveys.

If no email address is specified, you won't receive copies of any sent reports but the branch will always be sent it.

Details must be set for branch and contractor name or no surveys will be sent.

CEF Branch:

Contractor Name

EMail Address

Done

Send unsent surveys

Survey packages that will be sent

Cancel

Edit survey

Select a local survey package to edit

Cancel

Abandon survey?

Are you sure you want to abandon the survey?
Yes will lose any unsaved work, No will return to where you were.

Yes No

Save current survey?

Check the summary below then select Yes to save, or No to return to where you were.

If your E-Matic reference is the same as one that already exists locally, it will be overwritten with the newer one.

Yes Cancel

Email survey details


Email addresses to send report to:


Check the brief summary below then select Send Email,
or Cancel to return to where you were.

Send Email Cancel